Showing posts with label Sub Station. Show all posts
Showing posts with label Sub Station. Show all posts

Thursday, March 21, 2013

Raspberry Pi Basic Setup - Hardware

Since I got my hands on the Raspberry Pi (Model B) its been tinkering and tinkering. As you can see in the image above, I built my own case with the help of JKUAT Arch. colleague of mine who assisted with the dimensions and the white cardboard.
Away from that, today I want to show you the basic hardware that when out together with the Pi will make a successful run.

Sunday, January 6, 2013

Wind Power Kenya is 3 Years Old

Happy New Year to all my readers, hope your year started on a high voltage. Today Wind Power Kenya turns 3 years old, a milestone and remarkable achievement it is. Looking back its been a long and informative electric journey and I am very thankful to you all for taking time to read, comment  & correct me where I make a mistake.

Now this year will be one very busy for me as I try to master my Chinese - which I started learning last year May. Yeah, Chinese is not easy but al make it. Also since now I have my Raspberry Pi and Arduino UNO there is pressure to put them to work so I will be juggling very many things. Anyway Chinese will come first so the rest can chill a little bit. Also I want to start a year long project to model an outdoor  substation so a s to lean what happens inside to detail.

Anyway, that's my year planned, lemme celebrate this achievement :-) [circuit open]


Wednesday, August 18, 2010

Kenyan Cabinet approves a 421MW Power Generation Programme

The power shortage in Kenya is set to ease following Tuesday’s move by the Cabinet to approve a major generation programme.
Under the New Planned Power Generation Capacity Programme, six power projects are to be initiated this year.They include:

21MW Songoro Hydropower Project.
10MW Tana Hydropower Project.
5MW Ngong Windpower Project.
80MW Early Geothermal Power Project.
25MW Kindaruma Upgrade.
280MW Olkaria 1 and Olkaria 4.
 “In this regard Cabinet forwards for parliamentary approval the establishment of an escrow guarantee fund for semi-concessional loans for external borrowing by KenGen and Kenya Electricity Transmission Company from EIB and KFW to finance the additional power generation of 421 megawatts,” a statement issued by the Presidential Press Service said.

Wednesday, May 12, 2010

50kVA PMTx Substation Transformer

Name : 50kVA Pole Mounted Substation Transformer
Rating: 50kVA
Cooling: Oil Cooled
Application: Commercial,Heavy Residential,Farmhold

This  type of transformer is mainly used for Step-Down purposes of voltages in the range of 11kV~415/240V.


Thursday, April 22, 2010

Power System Network


A detailed explanation of the conversion and distribution of electric energy from the power station to consumer units.This post describes how electric energy moves from the power generating station through conductors of various sizes to consumers premises.To minimize losses and for economical reasons, electrical energy has to be converted into different magnitudes during transmission and distribution until the consumer load.