Tuesday, August 7, 2012

The Turbines Have Arrived!

Its with pleasure that the 'manufacturer' has finally delivered the Turbines. they came in yesterday and I have installed them except the nacelle which will be mounted towards the end due to mechanical breakage while other items are being installed too.

The towers are while made of durable plastic resin that will not corrode with the varying acidity of the soil and also termites that may come along.

As for the rest of the project, all is going well except for the quick growth of vegetation. I did drop a bean seed into the soil and Alas! within days a beanstalk was shooting. I left it to grow as long as it did not come into my way.

Plans are being improved to add residential home models which a friend of mine studying architecture will design for me. Electrical cables will be added thanks to my skills in AutoCAD Electrical 2012. Have a look...

ORIGINAL: The site before the turbines were installed.